Separate equipment supply from system responsibility

List who selects, purchases and warrants the robot, controller, EOAT, process equipment, fixtures, safety devices and adjacent machines. A hardware supplier is not automatically responsible for cell performance.

  • Equipment selection and procurement
  • Compatibility and interface approval
  • Warranty route for each item

Assign engineering and programming owners

Mechanical, electrical, PLC/HMI, robot, vision and process programming need named owners plus input and output documents. Include software backups, source access, passwords and change control.

  • Mechanical and electrical design
  • PLC, HMI, robot and vision software
  • Documentation and backup ownership

Define FAT, site work and acceptance

Agree what is demonstrated before shipment, what site utilities and production parts are required, who installs and commissions, and how SAT differs from FAT. Every acceptance criterion should have evidence and an approver.

  • FAT parts, run time and pass criteria
  • Shipping, installation and utilities
  • SAT, training and production handoff

Close lifecycle responsibilities

Record response expectations, remote or on-site support, preventive maintenance, spare parts, consumables, warranty exclusions and responsibility for future part changes. These items belong in commercial comparison, not after delivery.

  • Training and maintenance documents
  • Critical spares and consumables
  • Warranty and after-sales boundary

Decision checklist

Use the same inputs when comparing supplier proposals.

Decision areaInputs to confirm
Separate equipment supply from system responsibilityEquipment selection and procurement; Compatibility and interface approval; Warranty route for each item
Assign engineering and programming ownersMechanical and electrical design; PLC, HMI, robot and vision software; Documentation and backup ownership
Define FAT, site work and acceptanceFAT parts, run time and pass criteria; Shipping, installation and utilities; SAT, training and production handoff
Close lifecycle responsibilitiesTraining and maintenance documents; Critical spares and consumables; Warranty and after-sales boundary

Move from research to a commercial review

Send the current supplier list and open work packages to identify integration gaps.

Define integration responsibility ↗