JY-3600 Welding Fume Extractors: conceptual configuration
Fume & dust extraction

JY

JY-3600 Welding Fume Extractors

The JY-3600 and JY-3600S routes compare single-arm and dual-arm capture around a shared published 2.2 kW, 380 V/50 Hz equipment basis. Two arms do not automatically mean two fully served simultaneous weld stations.

Request a project quote
Overview

Choose the configuration around your production task.

The JY-3600 and JY-3600S routes compare single-arm and dual-arm capture around a shared published 2.2 kW, 380 V/50 Hz equipment basis. Two arms do not automatically mean two fully served simultaneous weld stations. Define branch use, hood locations, available pressure and filter loading before sizing the extraction package.

Choose fume or dust extraction from the contaminant and capture point, then size the complete air path. Nominal collector airflow is not the flow delivered at a hood after duct losses, branches and loaded filters. Record the welding or grinding process, material, consumables, number of simultaneous stations and the location of the emission. Hood position, operator access and robot travel have to coexist. A portable arm can suit a changing workstation, while a central collector requires a duct and branch-control plan. Grinding dust, hot particles, combustible materials and mixed processes need a specific fire and dust-risk review; do not treat every collector as interchangeable. Specify filter type, replacement access, pulse-air requirements, collection-bin handling, discharge or recirculation arrangements and commissioning measurements. Filtration percentages do not establish worker exposure or regulatory compliance. Acceptance should test capture under the agreed operating conditions, with responsibility for ventilation design and workplace assessment clearly assigned.

Product facts

Published specifications

Published selection values: Models: JY-3600S / JY-3600 · Motor power: 2.2kW · Power supply: 380V/50HZ · Dimensions: 800*900*1600mm. Read each model row separately; family ranges are not combined ratings.

ModelsJY-3600S / JY-3600
Motor power2.2kW
Power supply380V/50HZ
Dimensions800*900*1600mm
MODEL COMPARISON

Compare the model before you compare the quote.

Model / arrangementPublished selection parameters
JY-3600S
Motor power
2.2kW
Power supply
380V/50HZ
Dimensions
800*900*1600mm
JY-3600
Motor power
2.2kW
Power supply
380V/50HZ
Dimensions
800*900*1600mm
SELECTION ROUTES

Which configuration fits the task?

01

Portable arm

Capture near a changing work location; confirm hood positioning and reach.

02

Central collection

Coordinate simultaneous branches, pressure and filter servicing.

03

Grinding extraction

Review particles, sparks, materials and dust/fire risks separately.

Selection brief

Selection and RFQ matrix

Process, material, contaminant and simultaneous capture points · Hood geometry, duct route and pressure losses · Filter service, waste handling and site verification

Commercial fitCompare the equipment-only and integrated-cell scopes line by line. Ask whether the drive/control package, tooling, mounting, cables, utilities, guarding, programming, freight, installation and training are included. A lower initial equipment price can represent a different scope rather than the same system at a lower cost. Define documentation languages, destination requirements, acceptance conditions, spare-parts responsibilities and the process for design changes in the proposal. This gives purchasing and engineering a common basis for selection.
Inputs that speed up a quotePrepare a drawing-led RFQ with revision, product family, required operation, operating sequence and existing equipment identifiers. Add the layout, utilities, environmental conditions and access limits. State who owns the fixture or end effector and who will verify each interface. Ask for the proposed configuration, inclusions, exclusions, technical documents, acceptance plan and site responsibilities in the response. This lets suppliers price the same task and makes unresolved choices visible before an order is placed.
What to confirmSelection inputsProject action
Process, material, contaminant and simultaneous capture pointsModels: JY-3600S / JY-3600 · Motor power: 2.2kW · Power supply: 380V/50HZ · Dimensions: 800*900*1600mmSelect the exact model and define the loaded operating conditions.
Hood geometry, duct route and pressure lossesCurrent part drawing, process sequence and layout.Agree the motion, access and changeover checks before ordering.
Filter service, waste handling and site verificationExisting equipment versions, service connections and access limits.Assign an owner for each interface and its acceptance test.
Delivery and acceptance scopeItemized equipment, integration, freight and site-work proposal.Agree inclusions, exclusions, testing and handover responsibilities.
Project decision flow

From requirements to equipment handover.

  1. 01Part and process inputs
  2. 02Model and configuration selection
  3. 03Interfaces and layout
  4. 04Quotation and responsibilities
  5. 05Testing and handover
Typical application routes

Start from the production task.

  • 01Process extraction
FAQ

Questions before you request a quote

01How should I select JY-3600 Welding Fume Extractors?

Compare the listed arrangements: JY-3600S / JY-3600. Start with process, material, contaminant and simultaneous capture points, then define hood geometry, duct route and pressure losses. Use the model table to shortlist equipment and the project drawing to decide the final configuration. A family name alone does not define the supplied package.

02Does the listed airflow prove effective fume capture?

No. Useful capture depends on the hood, its distance and orientation, duct resistance, simultaneous branches, filter condition and the emission process. Define the design conditions and commissioning measurements. Filter efficiency is a separate characteristic and does not certify the installed workplace exposure level.

03What determines the equipment quotation?

A dual arm welding fume extractor quotation depends on the selected model or arrangement, tooling, control package, services, safeguards, testing and delivery scope. Separate equipment-only supply from complete-cell integration. Confirm quantity, destination, documentation, packaging and site work in the written proposal; prices and availability are not inferred from catalog values.

04Can the quotation include integration and commissioning?

The proposal can define equipment sourcing and partner-supported integration as separate work packages. Specify mechanical and electrical installation, software, commissioning, training, FAT/SAT, spares and service ownership. Existing robot/controller versions and site utilities must be identified before an interface or installation commitment is agreed.

05What should I send to request a project proposal?

Send process, material, contaminant and simultaneous capture points; hood geometry, duct route and pressure losses; filter service, waste handling and site verification. Add drawings, quantity, destination and the acceptance method. Identify existing equipment by model, nameplate and software revision. These inputs allow the technical proposal, interfaces and commercial exclusions to be discussed together.

PROJECT QUOTATION

Turn the product shortlist into a complete scope.

Send the workpiece, process, drawings, output target and destination. We will align the equipment with the technical interfaces and commercial delivery path.

Request a project quote ↗
Request a QuoteWhatsApp